Increase energy efficiency in the steel and metal industry with Thermal Storage

A stack of industrial steel pipes for high-temperature of thermal energy storage and decarbonization applications.

Transitioning the steel and non-ferrous metals industry is a great challenge. Switching to renewable energy and recovering high-temperature waste heat with thermal storage presents enormous potential for resilient process heat supply of metal-processing industries. Increasing energy efficiency in steel mills and prividing process heat for supplying processes from renewable energy sources is possible with Krafblock's thermal batteries.

Trusted by leaders and innovators
Maschinenfabrik Augsburg-Nürnberg (MAN) logo, german manufacturing and engineering company.Iqony company logo. Global service provider in renewable energy and climate-neutral technologies.Mitsubishi Power logo. Unit from Mitsubishi Electric Power Products, inc that provides power generation and energy solutions.EIT Climate-KIC logo. European Union climate change innovation agency.

Kraftblock use cases in the steel & metal industry

Steel mills

  • Flare gas utilization
  • Hot Stoves
  • Sinter Plant
Read more

Metal processing

  • Annealing
  • Tempering
  • Zinc coating
  • Steam generation
    (forges)

Copper

  • Preheating air
  • Drying Furnace Charge
  • Optimized Power Generation
Read more

Aluminium

  • Smelter
  • Digesters
  • Heaters
  • Preheating rotary kilns
Read more

Zinc

  • Roasting
  • Preheating air
  • Heating coker

Other metals

  • There are countless other processes and non-ferrous metals that can use Kraftblock's thermal energy storage system. Contact us so we can develop a solution for you.

Tata Steel Sinter Plant 3

 
Jamshedpur

Tata Steel

Start a project

Learn how you can optimize steel & metal production with Kraftblock.

01

Concept Draft

We analyze data, draft a project idea with size and operation mode and indicate a price.

02

Feasibility Study

We set up a detailed concept, define the interface and engineer the plant.

03

Project Execution

We procure, manufacture, erect, integrate and start up the storage system.